NOC – Gary Gedney | Edward Gilbert-Power Home Remodeling | 103 Orange Bud Way
103 Orange Bud Way, Plant City, FL 33563
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026061105 from official_records_noc
- 2026-05-22HCPACaptured HCPA_2050105594_901fb6d1 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 17.4 mi | 34.8 |
| quarry | Four Corners | Lithia | 18.9 mi | 37.9 |
| quarry | Tampa Cement Grinding Plant | Tampa | 19.9 mi | 39.8 |
| quarry | South Pasture Mine | Lithia | 26.9 mi | 53.7 |
| quarry | Caloosa Materials | Ruskin | 28.2 mi | 56.4 |
| sand pit | Gator Sand Mine | Brooksville | 32.3 mi | 64.7 |
| sand pit | Green Bay Mine | Davenport | 32.8 mi | 65.7 |
| quarry | South Fort Meade Mine | Lithia | 33.2 mi | 66.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2026061105 | 2026-05-21 | Open ↗ |
| hcpa | HCPA_2050105594_901fb6d1 | 2026-05-22 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 2050105594
- Strap
- P-32-28-22-65V-000003-00002.0
- Address
- 103 ORANGE BUD WAY, PLANT CITY
- Zip
- 33563
- Acreage
- 0.016 ac
- Sq ft
- 717
- Homestead
- NO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/edward-gilbert-power-home-remodeling-project-108-orange-bud-way-hillsborough-fl-bb4939e7