Leads/ec9cbcd8
Approved · unknownVOLUSIA County

Mitigation bank — Lake Monroe Mitigation Bank (997 ac)

Lake Monroe Mitigation Bank, VOLUSIA County, FL

Load estimate pending
Lifecycle
Permitted as of Sep 12, 1995
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mitigation bank — Lake Monroe Mitigation Bank (997 ac)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 9/12/1995 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Mitigation bank — 997 ac of wetland restoration. Multi-year project with fill / grading / water control structures. Contact: Casey Lyon. | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, but stale (30y old) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_MITIGATION_BANKS
    Captured FDEP_MITBANK_4-127-23097-1 from fdep_mitigation_banks

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Beeline Mine · Orlando
One-way
24.0 mi
Round trip
48 mi
TypeNameCityOne-wayRT mi
quarryBeeline MineOrlando24.0 mi48
quarryS & L Materials IncKISSIMMEE26.0 mi52.1
quarryRock Solid Rock, LLCTitusville32.0 mi64.1
sand pitAstatula Sand PlantJacksonville35.6 mi71.2
sand pitLisbon SandLexington36.9 mi73.8
sand pitCenter Sand CompanyClermont38.7 mi77.4
sand pitIndependent MineDavenport38.9 mi77.8
sand pitFour Corners Sand MineBrooksville41.0 mi81.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Volusia County Permits
Daytona / DeLand Building & Zoning
ConnectorRecord IDCapturedLink
fdep_mitigation_banksFDEP_MITBANK_4-127-23097-12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
VOLUSIA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/ec9cbcd8