FDOT — SR 72 (CLARK RD) FROM HONORE AVE TO W OF GANTT RD - RESURFAC ING
Sarasota County — FDOT Contract T1893
Load estimate pending
Lifecycle
Completed as of Jun 16, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 72 (CLARK RD) FROM HONORE AVE TO W OF GANTT RD - RESURFAC ING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$4.6M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 72 (CLARK RD) FROM HONORE AVE TO W OF GANTT RD - RESURFAC ING. Vendor: AJAX PAVING INDUSTRIES OF FLORIDA LLC. Cost: $4,641,884. | FDOT public project (+15) | size signal: $4,641,884 valuation (+12) | FDOT public project (+15) | size signal: $4,641,884 valuation (+12) | FDOT public project (+15) | size signal: $4,641,884 valuation (+12) | FDOT public project (+15) | size signal: $4,641,884 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T1893_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
23.6 mi
Round trip
47.2 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Florida Shell & Fill Company LLC | Naples | 23.6 mi | 47.2 |
| quarry | Wingate Creek Mine | Lithia | 26.0 mi | 52.1 |
| quarry | Caloosa Materials | Ruskin | 29.9 mi | 59.7 |
| quarry | 4M-31 Mine | Alva | 37.1 mi | 74.2 |
| sand pit | Washington Loop Mine | Punta Gorda | 37.8 mi | 75.7 |
| quarry | Bermont Materials Alico | Punta Gorda | 39.6 mi | 79.1 |
| quarry | South Pasture Mine | Lithia | 40.8 mi | 81.5 |
| quarry | Four Corners | Lithia | 45.4 mi | 90.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T1893_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)