Approved · unknownMARION County
Cleanup (petroleum cleanup) — PALMOUR PROPERTY
15750 NW GAINESVILLE RD, REDDICK, FL, 32686
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — PALMOUR PROPERTY
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 06434-000-00
Est truck loads
—
Needs site plan parse
Sources seen
10
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87800957 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_06434-000-00_eb257df3 from marionpa
- 2026-06-09FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87913408 from fdep_cleanup_sites
- 2026-06-09MARIONPACaptured MARIONPA_06434-000-00_80135f1b from marionpa
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87923628 from fdep_cleanup_sites
- 2026-06-11MARIONPACaptured MARIONPA_06434-000-00_f96326df from marionpa
- 2026-06-12FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87954281 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_06434-000-00_da5a4798 from marionpa
- 2026-06-24FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88066576 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_06434-000-00_92448316 from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Reddick Mine · Pompano Beach
One-way
1.2 mi
Round trip
2.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Reddick Mine | Pompano Beach | 1.2 mi | 2.4 |
| quarry | Ocala Quarry | Atlanta | 3.7 mi | 7.5 |
| quarry | Lowell Mine & Mill | Ocala | 4.0 mi | 8 |
| quarry | Stavola NW Pit | Ocala | 7.9 mi | 15.8 |
| quarry | RALEIGH QUARRY | WILLISTON | 15.4 mi | 30.7 |
| quarry | 328 Pit | Ocala | 16.4 mi | 32.8 |
| quarry | NORTH MINE | OCALA | 18.2 mi | 36.5 |
| sand pit | Lynne Mine | Davenport | 21.7 mi | 43.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87800957 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_06434-000-00_eb257df3 | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87913408 | 2026-06-09 | Open ↗ |
| marionpa | MARIONPA_06434-000-00_80135f1b | 2026-06-09 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87923628 | 2026-06-10 | Open ↗ |
| marionpa | MARIONPA_06434-000-00_f96326df | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87954281 | 2026-06-12 | Open ↗ |
| marionpa | MARIONPA_06434-000-00_da5a4798 | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88066576 | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_06434-000-00_92448316 | 2026-06-24 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 06434-000-00
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/eb257df3