Approved · unknownBay County
FDOT — SR 75 (US 231) AT PIPELINE ROAD INTERSECTION IMPROVEMENTS - INTERSECTION IMPROVEMENT
Bay County — FDOT Contract E3X37
Load estimate pending
Lifecycle
Completed as of Jun 30, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 75 (US 231) AT PIPELINE ROAD INTERSECTION IMPROVEMENTS - INTERSECTION IMPROVEMENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$2.6M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 75 (US 231) AT PIPELINE ROAD INTERSECTION IMPROVEMENTS - INTERSECTION IMPROVE. Vendor: C.W. ROBERTS CONTRACTING, INC.. Cost: $2,577,798. | FDOT public project (+15) | size signal: $2,577,798 valuation (+12) | FDOT public project (+15) | size signal: $2,577,798 valuation (+12) | FDOT public project (+15) | size signal: $2,577,798 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E3X37_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Sandhills Plant 2 · Dothan
One-way
16.9 mi
Round trip
33.9 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Sandhills Plant 2 | Dothan | 16.9 mi | 33.9 |
| sand pit | Panama City Quarry | Murfresboro | 27.1 mi | 54.2 |
| quarry | 1874 Marianna | Hammond | 38.4 mi | 76.7 |
| quarry | ROCKY CREEK MINE AND MILL | Marianna | 38.7 mi | 77.3 |
| sand pit | USA Calcium | Marianna | 43.8 mi | 87.6 |
| quarry | Marianna Hi-Cal / Alternative Materials | Irving | 44.3 mi | 88.6 |
| sand pit | MVM Landfill, LLC | DeFuniak Springs | 44.9 mi | 89.7 |
| quarry | Jones Pit | Chiefland | 47.3 mi | 94.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E3X37_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Bay
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/eaa8b8e8