Leads/e960de84
Approved · planning

Proposed Sherwin-Williams

SR 64 East, Bradenton, FL

Load estimate pending
Lifecycle
Permitted as of Apr 12, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Proposed Sherwin-Williams

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/12/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
SHW Lakewood, LLC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24SWFWMD_ERP
    Captured SWFWMD_ERP_930179 from swfwmd_erp
  2. 2026-05-24SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_930179_e960de84 from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Utility trenches (each LF ≈ 1 cy spoil)
dripline
1,922 LF
pipe sleeve
133.6 LF
irrigation lateral one inch
29.3 LF
irrigation lateral half inch
1,055 LF
irrigation mainline one inch
12.4 LF
irrigation lateral three quarter inch
255.6 LF
irrigation lateral one and quarter inch
10.5 LF
Drainage features (1)
  • 2 drainage swales
Plan notes: These plans are landscape and irrigation plans only (sheets L-1.0, L-1.1, L-2.0, L-2.1) for a commercial site on SR 64 East in Bradenton, FL; no grading, earthwork, or civil utility sheets are included in this set.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Wingate Creek Mine · Lithia
One-way
11.2 mi
Round trip
22.5 mi
TypeNameCityOne-wayRT mi
quarryWingate Creek MineLithia11.2 mi22.5
quarryCaloosa MaterialsRuskin17.7 mi35.4
quarrySouth Pasture MineLithia24.8 mi49.6
quarryFour CornersLithia28.5 mi57
quarry4M-31 MineAlva32.9 mi65.7
quarryTampa Cement Grinding PlantTampa32.8 mi65.7
quarrySouth Fort Meade MineLithia35.7 mi71.5
quarryFlorida Shell & Fill Company LLCNaples36.8 mi73.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
SHW Lakewood, LLC
Engineer of Record
Aloha Pacifica LLC Landscape Architecture + Water Features

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9301792026-05-24Open ↗
swfwmd_erp_plansSWFWMD_PLANS_930179_e960de842026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
City
Bradenton
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/e960de84