Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — SUNOCO #0846-9108
201 S FALKENBURG RD, TAMPA, FL, 33619
~133loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — SUNOCO #0846-9108
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.531 ac
Parcel 0680220000
Est truck loads
—
Needs site plan parse
Sources seen
6
Public records referencing this job
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87801950 from fdep_cleanup_sites
- 2026-06-09FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87914395 from fdep_cleanup_sites
- 2026-06-11HCPACaptured HCPA_0680220000_e8c6e246 from hcpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87985917 from fdep_cleanup_sites
- 2026-06-21HCPACaptured HCPA_0680220000_f7eed769 from hcpa
- 2026-06-23HCPACaptured HCPA_0680220000_abfc979c from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
6.6 mi
Round trip
13.2 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 6.6 mi | 13.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 17.7 mi | 35.3 |
| quarry | Caloosa Materials | Ruskin | 18.3 mi | 36.5 |
| quarry | Four Corners | Lithia | 25.8 mi | 51.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 31.5 mi | 63 |
| quarry | South Pasture Mine | Lithia | 31.7 mi | 63.4 |
| quarry | Wingate Creek Mine | Lithia | 33.8 mi | 67.6 |
| sand pit | County Line Mine | Spring Hill | 36.2 mi | 72.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87801950 | 2026-05-28 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87914395 | 2026-06-09 | Open ↗ |
| hcpa | HCPA_0680220000_e8c6e246 | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87985917 | 2026-06-16 | Open ↗ |
| hcpa | HCPA_0680220000_f7eed769 | 2026-06-21 | Open ↗ |
| hcpa | HCPA_0680220000_abfc979c | 2026-06-23 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 0680220000
- Strap
- U-19-29-20-ZZZ-000002-51570.0
- Address
- 201 S FALKENBURG RD, TAMPA
- Zip
- 33619
- Acreage
- 0.531 ac
- Sq ft
- 23,148
- Homestead
- NO
Owner of record
TAMPA FALKENBURG LLC
Last sale
2021-03-21
$100(transfer)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/e8c6e246