Leads/e8521d88
Approved · unknownMANATEE County

USACE 404 — 8300 DESOTO MEMORIAL HWY

8300 DESOTO MEMORIAL HWY, BRADENTON, FL, 34200

Load estimate pending
Lifecycle
Permitted as of Jul 25, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 8300 DESOTO MEMORIAL HWY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 7/25/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | utilities keywords (+15) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0037560-005-EI from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
9.0 mi
Round trip
18 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
17.5 mi
Round trip
35.1 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin17.5 mi35.1
quarryTampa Cement Grinding PlantTampa31.0 mi61.9
quarryWingate Creek MineLithia32.0 mi63.9
quarrySouth Pasture MineLithia43.5 mi86.9
quarryFlorida Shell & Fill Company LLCNaples44.0 mi88.1
quarryFour CornersLithia44.4 mi88.8
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton9.0 mi18
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota12.4 mi24.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0037560-005-EI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
MANATEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/e8521d88