Mitigation bank — Crystal Cove Mitigation Bank (220 ac)
Crystal Cove Mitigation Bank, Citrus County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 2/8/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_MITIGATION_BANKSCaptured FDEP_MITBANK_43046127.000 from fdep_mitigation_banks
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 2.6 mi | 5.2 |
| quarry | Red Level Mine | Crystal River | 2.9 mi | 5.7 |
| quarry | Inglis Quarry | Brooksville | 6.9 mi | 13.8 |
| quarry | Maylen Mine | Crystal River | 8.5 mi | 16.9 |
| quarry | Lecanto Mine | Crystal River | 11.3 mi | 22.5 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 13.7 mi | 27.4 |
| quarry | Calcium Plant | Jacksonville | 23.2 mi | 46.5 |
| quarry | 328 Pit | Ocala | 24.1 mi | 48.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_mitigation_banks | FDEP_MITBANK_43046127.000 | 2026-05-28 |
Parcel Detail
Property records and ownership
- County
- Citrus
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/e7cdc747