Leads/e70bb06f
Approved · application_filedManatee County

Erie Road Phase II Road Improvements Minor Modification

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Erie Road Phase II Road Improvements Minor Modification

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Manatee County Board of County Commissioners
Why this is a hauling opportunity: Base unknown/other (20) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_917478 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
10.2 mi
Round trip
20.4 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin10.2 mi20.4
quarryWingate Creek MineLithia22.2 mi44.3
quarryTampa Cement Grinding PlantTampa26.1 mi52.2
quarrySouth Pasture MineLithia33.1 mi66.1
quarryFour CornersLithia34.1 mi68.3
quarryFlorida Shell & Fill Company LLCNaples43.2 mi86.5
quarrySouth Fort Meade MineLithia44.7 mi89.5
quarry4M-31 MineAlva44.9 mi89.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Manatee County Board of County Commissioners

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9174782026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/e70bb06f