Approved · planning
1020 S. FLORIDA AVE SITE
1020 S. FLORIDA AVE, TARPON SPRINGS, FL, 34689
Load estimate pending
Lifecycle
Permitted as of Apr 15, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
1020 S. FLORIDA AVE SITE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
HENRY ROSS
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24FDEP_ERPCaptured FDEP_ERP_0460867-001-FD from fdep_erp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
24.5 mi
Round trip
49 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 24.5 mi | 49 |
| quarry | Tampa Cement Grinding Plant | Tampa | 24.8 mi | 49.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 25.1 mi | 50.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 30.1 mi | 60.2 |
| quarry | Caloosa Materials | Ruskin | 36.2 mi | 72.5 |
| quarry | Brooksville Quarry | Brooksville | 37.4 mi | 74.8 |
| quarry | Brooksville South Cement Plant | Brooksville | 38.2 mi | 76.4 |
| quarry | Calcium Plant | Jacksonville | 41.0 mi | 81.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
HENRY ROSS
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_erp | FDEP_ERP_0460867-001-FD | 2026-05-24 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/e2adf4f0