DOYONPICARD MELANIE project — Sarasota County
3040 GRAND BAY BLVD 235 LONGBOAT KEY
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22SARASOTA_NOCCaptured Sarasota_2022036164 from sarasota_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 24.9 mi | 49.9 |
| quarry | Wingate Creek Mine | Lithia | 31.4 mi | 62.8 |
| quarry | Florida Shell & Fill Company LLC | Naples | 34.2 mi | 68.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 40.0 mi | 80 |
| quarry | South Pasture Mine | Lithia | 45.0 mi | 90 |
| quarry | Four Corners | Lithia | 47.7 mi | 95.4 |
| quarry | 4M-31 Mine | Alva | 47.8 mi | 95.7 |
| landfill | RECOMMUNITY HOLDINGS LP (FKA RRS/FCR) | Sarasota | 5.4 mi | 10.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| sarasota_noc | Sarasota_2022036164 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Sarasota
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/doyonpicard-melanie-project-sarasota-county-sarasota-fl-23ffc18f