Approved · unknownHillsborough County
Dividing the conference room into a separate office has been removed from the scope of work. Addition of converting Lobby 400 in a teller station has been added to the scope of work.
4890 W Kennedy Blvd 400, T, 33609
~37loads
fill dirt
≤1 wk
Lifecycle
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Dividing the conference room into a separate office has been removed from the scope of work. Addition of converting Lobby 400 in a teller station has been added to the scope of work.
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.334 ac
Parcel 1132531000
Est truck loads
—
Needs site plan parse
Sources seen
3
Public records referencing this job
Why this is a hauling opportunity: Base unknown/other (20) | size signal: ~37 est. loads (+6)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-23TAMPA_ACCELACaptured BLD-26-0521231 from tampa_accela
- 2026-05-25HCPACaptured HCPA_1132531000_7fdc057d from hcpa
- 2026-05-25HCPACaptured HCPA_1132531000_161014c6 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
5.1 mi
Round trip
10.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 5.1 mi | 10.3 |
| quarry | Caloosa Materials | Ruskin | 17.4 mi | 34.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 22.8 mi | 45.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 30.6 mi | 61.3 |
| sand pit | County Line Mine | Spring Hill | 33.8 mi | 67.7 |
| quarry | Four Corners | Lithia | 36.1 mi | 72.3 |
| quarry | Wingate Creek Mine | Lithia | 39.4 mi | 78.8 |
| quarry | South Pasture Mine | Lithia | 40.9 mi | 81.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| tampa_accela | BLD-26-0521231 | 2026-05-23 | Open ↗ |
| hcpa | HCPA_1132531000_7fdc057d | 2026-05-25 | Open ↗ |
| hcpa | HCPA_1132531000_161014c6 | 2026-05-25 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1132531000
- Strap
- A-20-29-18-3L4-000000-00008.0
- Address
- 4890 W KENNEDY BLVD, TAMPA
- Zip
- 33609
- Acreage
- 0.334 ac
- Sq ft
- 14,533
- Homestead
- NO
Owner of record
ALLY URBAN CENTRE LLC
FRENCH QUARTER TAMPA LP
Last sale
2023-05-12
$123,000,000
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/dividing-the-conference-room-into-a-separate-office-has-been-removed-from-the-sc-1867a1d0