Leads/dividing-the-conference-room-into-a-separate-office-has-been-removed-from-the-sc-1867a1d0
Approved · unknownHillsborough County

Dividing the conference room into a separate office has been removed from the scope of work. Addition of converting Lobby 400 in a teller station has been added to the scope of work.

4890 W Kennedy Blvd 400, T, 33609

~37loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Dividing the conference room into a separate office has been removed from the scope of work. Addition of converting Lobby 400 in a teller station has been added to the scope of work.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.334 ac
Parcel 1132531000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
SPARTAN CONTRACTING CORPORATION
Developer / Applicant
ALLY URBAN CENTRE LLC
Why this is a hauling opportunity: Base unknown/other (20) | size signal: ~37 est. loads (+6)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-23TAMPA_ACCELA
    Captured BLD-26-0521231 from tampa_accela
  2. 2026-05-25HCPA
    Captured HCPA_1132531000_7fdc057d from hcpa
  3. 2026-05-25HCPA
    Captured HCPA_1132531000_161014c6 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
5.1 mi
Round trip
10.3 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa5.1 mi10.3
quarryCaloosa MaterialsRuskin17.4 mi34.9
quarryCentral State Aggregates LLCZephyrhill22.8 mi45.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.6 mi61.3
sand pitCounty Line MineSpring Hill33.8 mi67.7
quarryFour CornersLithia36.1 mi72.3
quarryWingate Creek MineLithia39.4 mi78.8
quarrySouth Pasture MineLithia40.9 mi81.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
ALLY URBAN CENTRE LLC
Contractor
SPARTAN CONTRACTING CORPORATION
1 active project · Hillsborough
~37 est. loads · fill dirt
Applicant
Infinity Engineering Group, LLC.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
tampa_accelaBLD-26-05212312026-05-23Open ↗
hcpaHCPA_1132531000_7fdc057d2026-05-25Open ↗
hcpaHCPA_1132531000_161014c62026-05-25Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1132531000
Strap
A-20-29-18-3L4-000000-00008.0
Address
4890 W KENNEDY BLVD, TAMPA
Zip
33609
Acreage
0.334 ac
Sq ft
14,533
Homestead
NO
Owner of record
ALLY URBAN CENTRE LLC
FRENCH QUARTER TAMPA LP
Last sale
2023-05-12
$123,000,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/dividing-the-conference-room-into-a-separate-office-has-been-removed-from-the-sc-1867a1d0