Dune Beach Structure — Other Coastal and Shore Protec (South Lake Worth Inlet District)
South Lake Worth Inlet
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 11/23/1987 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_COASTAL_ENVCaptured FDEP_COASTAL_ENV_-DBS870201 from fdep_coastal_env
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Palm Beach Aggregates LLC | Jacksonville | 23.2 mi | 46.5 |
| sand pit | Palm City Mine | Greenacres | 40.2 mi | 80.4 |
| sand pit | MC320 Mine | Palm City | 40.4 mi | 80.9 |
| quarry | Star Quarries | SOUTH BAY | 43.7 mi | 87.5 |
| quarry | Five Stones Mine, LLC. | Tinton Falls | 44.9 mi | 89.8 |
| quarry | 1412 Canal Point | Hammond | 46.8 mi | 93.5 |
| quarry | WHITE ROCK QUARRIES | West Palm Beach | 47.2 mi | 94.3 |
| transfer station | SWA CENTRAL COUNTY TRANSFER STATION | Lantana | 3.3 mi | 6.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_coastal_env | FDEP_COASTAL_ENV_-DBS870201 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/dd203fbf