Leads/dcb543a1
Approved · planning

VOSO - Phase 31B Communications Tower

Wildwood, FL

~55loads
fill dirt
≤1 wk
Lifecycle
Permitted as of Mar 11, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

VOSO - Phase 31B Communications Tower

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/11/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.498 ac
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
The Villages Development Company, LLC
Why this is a hauling opportunity: Base unknown/other (20) | size signal: ~55 est. loads (+6) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24SWFWMD_ERP
    Captured SWFWMD_ERP_935514 from swfwmd_erp
  2. 2026-06-24SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_935514_dcb543a1 from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Max grading change16.5 ft
Drainage features (4)
  • 1 dry retention basin (BX-103
  • TOB=93.00
  • DLW=87.00
  • BTM=79.00) adjacent to site; silt fence (536 LF) for erosion control; temporary gravel construction entrance
Plan notes: Grading plan references a geotechnical engineering study for undercut and backfill with clean sand for the entire building pad area. No formal earthwork cut/fill summary table is present on these plans.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
SUMTERVILLE QUARRY · Ocala
One-way
7.7 mi
Round trip
15.4 mi
TypeNameCityOne-wayRT mi
quarrySUMTERVILLE QUARRYOcala7.7 mi15.4
quarrySUMTERVILLE MINEOcala8.0 mi15.9
quarrySumterville Cement PlantSumterville8.0 mi15.9
quarrySt Catherine MineBrooksville11.6 mi23.2
sand pitOkahumpkaLeesburg12.6 mi25.2
sand pitWeirsdale Sand PlantJacksonville13.6 mi27.2
sand pitLisbon SandLexington16.5 mi33.1
quarryNORTH MINEOCALA18.7 mi37.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
The Villages Development Company, LLC
Engineer of Record
Clymer Farner Barley, Inc.

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9355142026-05-24Open ↗
swfwmd_erp_plansSWFWMD_PLANS_935514_dcb543a12026-06-24Open ↗

Parcel Detail

Property records and ownership

Property
City
Wildwood
Acreage
0.498 ac
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)