Leads/d9e36058
Approved · planningSarasota County

Fruitville Tatum Warehouse

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
Permitted as of Feb 19, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Fruitville Tatum Warehouse

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/19/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
7978 CCB 30 LLC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_927342 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Wingate Creek Mine · Lithia
One-way
20.9 mi
Round trip
41.8 mi
TypeNameCityOne-wayRT mi
quarryWingate Creek MineLithia20.9 mi41.8
quarryCaloosa MaterialsRuskin25.0 mi49.9
quarryFlorida Shell & Fill Company LLCNaples27.8 mi55.6
quarry4M-31 MineAlva35.2 mi70.5
quarrySouth Pasture MineLithia35.5 mi71
sand pitWashington Loop MinePunta Gorda38.6 mi77.2
quarryFour CornersLithia39.8 mi79.7
quarryBermont Materials AlicoPunta Gorda40.4 mi80.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
7978 CCB 30 LLC
7978 COOPER CREEK BLVD UNIVERSITY PARK, FL 34201

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9273422026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/d9e36058