Approved · unknownOrange County
FDOT — TSM&O WESTERN BELTWAY (SR429)/US192 INTERCHANGE SB OFF-RAMP (MP5.5) - INTERCHANGE IMPROVEMENT
Orange County — FDOT Contract E8V68
Load estimate pending
Lifecycle
Active as of Jul 14, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — TSM&O WESTERN BELTWAY (SR429)/US192 INTERCHANGE SB OFF-RAMP (MP5.5) - INTERCHANGE IMPROVEMENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$14.7M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT earthwork contract — TSM&O WESTERN BELTWAY (SR429)/US192 INTERCHANGE SB OFF-RAMP (MP5.5) - INTERCHANG. Vendor: SOUTHLAND CONSTRUCTION, INC.. Cost: $14,691,420. | FDOT public project (+15) | size signal: $14,691,420 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,691,420 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,691,420 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,691,420 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E8V68_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Cypress Sand · Lexington
One-way
4.8 mi
Round trip
9.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Cypress Sand | Lexington | 4.8 mi | 9.5 |
| sand pit | Hilochee Sand Mine | Davenport | 5.4 mi | 10.7 |
| sand pit | Green Bay Mine | Davenport | 6.9 mi | 13.9 |
| sand pit | Four Corners Sand Mine | Brooksville | 7.8 mi | 15.6 |
| sand pit | Gator Sand Mine | Brooksville | 8.0 mi | 15.9 |
| sand pit | Lake Sand Plant | Jacksonville | 8.7 mi | 17.3 |
| sand pit | 474 Sand Mine | Brooksville | 8.9 mi | 17.7 |
| quarry | FLINT PLANT | Davenport | 11.1 mi | 22.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E8V68_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Orange
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/d8dfb525