Leads/d7dbee04
Approved · unknown

Coastal Env — Nourishment (Venice Inlet Dredging)

Venice Beach

Load estimate pending
Lifecycle
Filed as of Jun 30, 1995
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Coastal Env — Nourishment (Venice Inlet Dredging)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 6/30/1995 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (coastal_env) — Nourishment. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_WQC-00025 from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
13.9 mi
Round trip
27.8 mi
TypeNameCityOne-wayRT mi
quarryFlorida Shell & Fill Company LLCNaples13.9 mi27.8
sand pitWashington Loop MinePunta Gorda33.5 mi67
quarryWingate Creek MineLithia33.9 mi67.8
quarryBermont Materials AlicoPunta Gorda35.0 mi70
quarry4M-31 MineAlva37.8 mi75.7
quarryCaloosa MaterialsRuskin40.6 mi81.3
quarryHalls MineNaples44.1 mi88.1
sand pitWatermelon PitPunta Gorda44.2 mi88.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_WQC-000252026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/d7dbee04