Leads/d575684f
Approved · planning

DENTON DOCK 300

2103 27TH AVENUE BLVD W, PALMETTO, FL, 34221

Load estimate pending
Lifecycle
Permitted as of Oct 31, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

DENTON DOCK 300

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
JOHN DENTON
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0446162-005-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
7.8 mi
Round trip
15.6 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.0 mi
Round trip
29.9 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin15.0 mi29.9
quarryWingate Creek MineLithia28.9 mi57.9
quarryTampa Cement Grinding PlantTampa29.2 mi58.4
quarrySouth Pasture MineLithia40.3 mi80.6
quarryFour CornersLithia41.3 mi82.6
quarryFlorida Shell & Fill Company LLCNaples43.5 mi87
quarryCentral State Aggregates LLCZephyrhill49.7 mi99.4
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton7.8 mi15.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
JOHN DENTON

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0446162-005-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/d575684f