Leads/d50303b6
Approved · planning

NORTH TAMPA STREET TOWNHOMES

2709 N TAMPA ST, TAMPA, FL, 33602

Load estimate pending
Lifecycle
Permitted as of Aug 19, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NORTH TAMPA STREET TOWNHOMES

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 8/19/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
ENVIRONMENTAL ENGINEERING CONSULTANTS INC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0452233-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.5 mi
Round trip
5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa2.5 mi5
quarryCaloosa MaterialsRuskin18.4 mi36.7
quarryCentral State Aggregates LLCZephyrhill19.1 mi38.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.9 mi57.8
sand pitCounty Line MineSpring Hill32.7 mi65.5
quarryFour CornersLithia33.1 mi66.2
quarrySouth Pasture MineLithia38.5 mi76.9
quarryWingate Creek MineLithia38.4 mi76.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
ENVIRONMENTAL ENGINEERING CONSULTANTS INC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0452233-001-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/d50303b6