Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — FDOT RIGHT OF WAY
2801 S 50TH ST & 4919 CAUSEWAY BLVD, TAMPA, FL, 33619
~25loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 15, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — FDOT RIGHT OF WAY
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.099 ac
Parcel 0468340000
Est truck loads
—
Needs site plan parse
Sources seen
6
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: ~25 est. loads (+6) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87986104 from fdep_cleanup_sites
- 2026-06-21HCPACaptured HCPA_0468340000_d45f9198 from hcpa
- 2026-06-24FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88067746 from fdep_cleanup_sites
- 2026-06-24HCPACaptured HCPA_0468340000_b76b5199 from hcpa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88088144 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_0468340000_f7233d24 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.6 mi
Round trip
5.2 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 2.6 mi | 5.2 |
| quarry | Caloosa Materials | Ruskin | 15.4 mi | 30.7 |
| quarry | Central State Aggregates LLC | Zephyrhill | 20.5 mi | 41 |
| quarry | Four Corners | Lithia | 28.5 mi | 57.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 32.4 mi | 64.9 |
| quarry | South Pasture Mine | Lithia | 33.7 mi | 67.5 |
| quarry | Wingate Creek Mine | Lithia | 33.9 mi | 67.7 |
| sand pit | County Line Mine | Spring Hill | 36.6 mi | 73.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87986104 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_0468340000_d45f9198 | 2026-06-21 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88067746 | 2026-06-24 | Open ↗ |
| hcpa | HCPA_0468340000_b76b5199 | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88088144 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_0468340000_f7233d24 | 2026-06-26 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 0468340000
- Strap
- U-33-29-19-1Q3-000001-00001.0
- Address
- 2801 S 50TH ST, TAMPA
- Zip
- 33619
- Acreage
- 0.099 ac
- Sq ft
- 4,333
- Homestead
- NO
Owner of record
NCJ INVESTMENT COMPANY
Last sale
2002-08-07
$100(transfer)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/d45f9198