Approved · unknownPinellas County
Beach nourishment — Clearwater Pass North Shore (3,200 cy)
Clearwater Pass North Shore, Pinellas County, FL
Load estimate pending
Lifecycle
Completed as of Mar 1, 2017
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Beach nourishment — Clearwater Pass North Shore (3,200 cy)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$38K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Beach nourishment Clearwater Pass Sand Placement Project — 3,200 cy placed. Source: Clearwater Pass. Type: Sand Bypass. Counties with prior nourishment cycle every 6-10 years.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_SAND_PLACEMENTCaptured FDEP_SANDPLACE_328 from fdep_sand_placement
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
CITY OF CLEARWATER TRANSFER STATION · Clearwater
One-way
5.9 mi
Round trip
11.8 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
23.7 mi
Round trip
47.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 23.7 mi | 47.4 |
| quarry | Caloosa Materials | Ruskin | 29.9 mi | 59.9 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 35.6 mi | 71.2 |
| sand pit | County Line Mine | Spring Hill | 35.8 mi | 71.6 |
| quarry | Central State Aggregates LLC | Zephyrhill | 36.4 mi | 72.8 |
| quarry | Brooksville Quarry | Brooksville | 48.6 mi | 97.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 49.3 mi | 98.7 |
| transfer station | CITY OF CLEARWATER TRANSFER STATION | Clearwater | 5.9 mi | 11.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_sand_placement | FDEP_SANDPLACE_328 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/d0e8c5d3