Mitigation bank — Lake Washington (1,658 ac)
Lake Washington, BREVARD County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 7/21/2016 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_MITIGATION_BANKSCaptured FDEP_MITBANK_4-009-135425-1 from fdep_mitigation_banks
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Buck Hammock | Orlando | 9.7 mi | 19.4 |
| quarry | Brisbane Pit | Fellsmere | 19.8 mi | 39.6 |
| sand pit | Sunshine Mine | Fort Pierce | 20.9 mi | 41.9 |
| quarry | Rock Solid Rock, LLC | Titusville | 24.8 mi | 49.6 |
| quarry | S & L Materials Inc | KISSIMMEE | 29.6 mi | 59.2 |
| quarry | Beeline Mine | Orlando | 31.1 mi | 62.3 |
| sand pit | Vero Rock and Sand | Vero Beach | 31.4 mi | 62.8 |
| sand pit | Blue Goose Mine | Fort Pierce | 32.1 mi | 64.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_mitigation_banks | FDEP_MITBANK_4-009-135425-1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- BREVARD
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/d0c24d14