Leads/cruise-terminal-3-traffic-circ-ef4b7e2f
Active · utilitiesHillsborough County

CRUISE TERMINAL 3 TRAFFIC CIRC

1325 YORK ST, TAMPA, FL, 33602

~43loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

CRUISE TERMINAL 3 TRAFFIC CIRC

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$18.2M
Actual — from source record
Acreage
0.257 ac
Parcel 1901520000
Est truck loads
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
TAMPA PORT AUTHORITY
Why this is a hauling opportunity: Base site_development/stormwater (40) | size signal: ~43 est. loads (+6) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-02-25NPDES_STORMWATER
    Captured FLR10BO42 from npdes_stormwater
  2. 2026-05-16HCPA
    Captured HCPA_1901520000 from hcpa
  3. 2026-05-16HCPA
    Captured HCPA_1901520000_ef4b7e2f from hcpa
  4. 2026-05-22HCPA
    Captured HCPA_1901520000_bc916c4d from hcpa
  5. 2026-05-25HCPA
    Captured HCPA_1901520000_cdaa7f81 from hcpa
  6. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_192919ZZZ000005933200A_cdaa7f81 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
0.7 mi
Round trip
1.5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa0.7 mi1.5
quarryCaloosa MaterialsRuskin16.8 mi33.6
quarryCentral State Aggregates LLCZephyrhill20.0 mi39.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.5 mi61
quarryFour CornersLithia31.5 mi63.1
sand pitCounty Line MineSpring Hill34.4 mi68.8
quarryWingate Creek MineLithia36.6 mi73.2
quarrySouth Pasture MineLithia36.8 mi73.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10BO422026-02-25Open ↗
hcpaHCPA_19015200002026-05-16Open ↗
hcpaHCPA_1901520000_ef4b7e2f2026-05-16Open ↗
hcpaHCPA_1901520000_bc916c4d2026-05-22Open ↗
hcpaHCPA_1901520000_cdaa7f812026-05-25Open ↗
fl_dor_cadastralFDOR_192919ZZZ000005933200A_cdaa7f812026-05-28Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1901520000
Strap
A-19-29-19-ZZZ-000005-93320.0
Address
1325 E YORK ST, TAMPA
Zip
33602
Acreage
0.257 ac
Sq ft
11,181
Homestead
NO
Owner of record
TAMPA PORT AUTHORITY
Last sale
2007-06-28
$100(transfer)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/cruise-terminal-3-traffic-circ-ef4b7e2f