Construction project — L 19 ETAL RUSKIN RESERVE NORTH & RUSKIN RESERVE SO
Hillsborough, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 11/15/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-02OFFICIAL_RECORDS_NOCCaptured Hillsborough_2024473519 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Contact Graph
Who's involved and how
- ★CFO W · EVP
- ★CFO W · EVP
- ★COO M · EVP
- ★COO M · EVP
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2024473519 | 2026-07-02 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/construction-project-l-19-etal-ruskin-reserve-north-ruskin-reserve-so-hillsborou-d68c70f9