Leads/construction-project-hillsborough-county-hillsborough-fl-139ea41f
Approved · unknownHillsborough County

NOC – Keldrian Davis | 730 South 58th Street

730 South 58th Street, Tampa, FL 33619

Load estimate pending
Lifecycle
Permitted as of Nov 26, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Keldrian Davis | 730 South 58th Street

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
DAVIS KELDRIAN
Developer / Applicant
DAVIS KELDRIAN
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; replace 12 side by side windows and 2 doors | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025502526 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.2 mi
Round trip
6.5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa3.2 mi6.5
quarryCaloosa MaterialsRuskin16.7 mi33.3
quarryCentral State Aggregates LLCZephyrhill19.1 mi38.2
quarryFour CornersLithia28.3 mi56.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 31.4 mi62.8
quarrySouth Pasture MineLithia33.8 mi67.6
quarryWingate Creek MineLithia34.5 mi69.1
sand pitCounty Line MineSpring Hill35.7 mi71.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DAVIS KELDRIAN
Contractor
DAVIS KELDRIAN

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20255025262026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/construction-project-hillsborough-county-hillsborough-fl-139ea41f