Approved · unknownHillsborough County
NOC – Keldrian Davis | 730 South 58th Street
730 South 58th Street, Tampa, FL 33619
Load estimate pending
Lifecycle
Permitted as of Nov 26, 2025
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
NOC – Keldrian Davis | 730 South 58th Street
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
DAVIS KELDRIAN
Developer / Applicant
DAVIS KELDRIAN
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; replace 12 side by side windows and 2 doors | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025502526 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.2 mi
Round trip
6.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 3.2 mi | 6.5 |
| quarry | Caloosa Materials | Ruskin | 16.7 mi | 33.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 19.1 mi | 38.2 |
| quarry | Four Corners | Lithia | 28.3 mi | 56.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 31.4 mi | 62.8 |
| quarry | South Pasture Mine | Lithia | 33.8 mi | 67.6 |
| quarry | Wingate Creek Mine | Lithia | 34.5 mi | 69.1 |
| sand pit | County Line Mine | Spring Hill | 35.7 mi | 71.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
DAVIS KELDRIAN
Contractor
DAVIS KELDRIAN
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2025502526 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/construction-project-hillsborough-county-hillsborough-fl-139ea41f