Leads/coldstream-exteriors-tampa-llc-project-2803-winding-trail-dr-valrico-fl-33596-hi-184da7d6
Approved · unknownHillsborough County

NOC – William Laslo Jr | Coldstream Exteriors Tampa LLC | 2803 Winding Trail Dr

2803 Winding Trail Dr, Valrico, FL 33596

Load estimate pending
Lifecycle
Permitted as of Dec 10, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – William Laslo Jr | Coldstream Exteriors Tampa LLC | 2803 Winding Trail Dr

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Parcel 087182.5458
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
COLDSTREAM EXTERIORS TAMPA LLC
📞 (813) 575-7663
Developer / Applicant
DAVIS JONATHAN
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Re-Roof with asphalt shingles. Tear down to bare decking. Replace rotted and re-nail all decking. New flashings, boots, starters, drip edge and shingles installed.

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-04OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2021639569 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
14.1 mi
Round trip
28.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa14.1 mi28.1
quarryFour CornersLithia17.8 mi35.6
quarryCaloosa MaterialsRuskin19.6 mi39.1
quarryCentral State Aggregates LLCZephyrhill21.3 mi42.5
quarrySouth Pasture MineLithia24.2 mi48.4
quarryWingate Creek MineLithia28.6 mi57.1
quarrySouth Fort Meade MineLithia33.2 mi66.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 37.2 mi74.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DAVIS JONATHAN
Contractor
COLDSTREAM EXTERIORS TAMPA LLC
2 active projects · Hillsborough
~3 est. loads · fill dirt
📞 (813) 575-7663

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20216395692026-07-04Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
087182.5458
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/coldstream-exteriors-tampa-llc-project-2803-winding-trail-dr-valrico-fl-33596-hi-184da7d6