NOC – Spaulding Marylin | CMK Construction Inc | BATHROOM REMODEL
5100 Burchette Road unit 2102, Tampa, FL 33847
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
**NOC – Spaulding Marylin Bathroom Remodel** is an active bathroom renovation project at a Tampa condo (5100 Burchette Road, Unit 2102) with strong permitting signals (NOC filing), presenting solid demand for demolition debris removal and potential fixture/material hauling. CMK Construction Inc (813-379-2116) is the general contractor managing the work, with multiple property owners involved including Spaulding Marilyn (407-942-3107) and the Faircrest Condominium Association, making this an ideal contact target for waste removal and interior material transport services in the residential renovation segment.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-14OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026099461 from official_records_noc
- 2026-04-24OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026157624 from official_records_noc
- 2026-05-19HCPACaptured HCPA_0347563551_c65db49b from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 10.1 mi | 20.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 11.0 mi | 21.9 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 21.2 mi | 42.3 |
| sand pit | County Line Mine | Spring Hill | 25.8 mi | 51.6 |
| quarry | Caloosa Materials | Ruskin | 26.8 mi | 53.7 |
| quarry | West Florida Aggregate | Webster | 33.0 mi | 66 |
| quarry | Brooksville Quarry | Brooksville | 34.2 mi | 68.3 |
| quarry | Brooksville South Cement Plant | Brooksville | 34.3 mi | 68.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2026099461 | 2026-03-14 | Open ↗ |
| official_records_noc | Hillsborough_2026157624 | 2026-04-24 | Open ↗ |
| hcpa | HCPA_0347563551_c65db49b | 2026-05-19 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 0347563551
- Strap
- A-34-27-19-1DU-000000-C0000.0
- Address
- 5100 BURCHETTE RD, TAMPA
- Zip
- 33647
- Acreage
- 0.548 ac
- Sq ft
- 23,852
- Homestead
- NO
No sale on record
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/cmk-construction-inc-project-hillsborough-county-hillsborough-fl-6a2f8610