QUALITY FIRST ROOFING LLC project — 08-26-21
08-26-21
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025121113 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2026008894 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2026093001 from pasco_noc
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_08-26-21-0030-00000-0520_664b79d0 from fl_dor_cadastral
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_08-26-21-0030-00000-0520_1a30c1ab from fl_dor_cadastral
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_08-26-21-0030-00000-0520_1533503f from fl_dor_cadastral
- 2026-06-08PASCOPACaptured PASCOPA_08-26-21-0030-00000-0520_1a30c1ab from pascopa
- 2026-06-08PASCOPACaptured PASCOPA_08-26-21-0030-00000-0520_1533503f from pascopa
- 2026-06-08PASCOPACaptured PASCOPA_08-26-21-0030-00000-0520_664b79d0 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 4.6 mi | 9.2 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 18.9 mi | 37.8 |
| quarry | West Florida Aggregate | Webster | 19.5 mi | 39.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 24.5 mi | 48.9 |
| sand pit | County Line Mine | Spring Hill | 24.7 mi | 49.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 27.0 mi | 54 |
| quarry | Brooksville Quarry | Brooksville | 27.2 mi | 54.4 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 28.7 mi | 57.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025121113 | 2026-05-21 | Open ↗ |
| pasco_noc | Pasco_2026008894 | 2026-05-21 | Open ↗ |
| pasco_noc | Pasco_2026093001 | 2026-05-21 | Open ↗ |
| fl_dor_cadastral | FDOR_08-26-21-0030-00000-0520_664b79d0 | 2026-05-28 | Open ↗ |
| fl_dor_cadastral | FDOR_08-26-21-0030-00000-0520_1a30c1ab | 2026-05-28 | Open ↗ |
| fl_dor_cadastral | FDOR_08-26-21-0030-00000-0520_1533503f | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_08-26-21-0030-00000-0520_1a30c1ab | 2026-06-08 | Open ↗ |
| pascopa | PASCOPA_08-26-21-0030-00000-0520_1533503f | 2026-06-08 | Open ↗ |
| pascopa | PASCOPA_08-26-21-0030-00000-0520_664b79d0 | 2026-06-08 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 08-26-21-0030-00000-0520
- Strap
- 08-26-21-0030-00000-0520
- Address
- 35446 LAKE EDWARD DRIVE, ZEPHYRHILLS
- Zip
- 33541
- Acreage
- 0.75 ac
- Sq ft
- 32,670
No sale on record
- Just (market)
- $272,031