Leads/cfe-federal-credit-union-lake-nona-orange-fl-b0840215
Approved · unknownOrange County

CFE FEDERAL CREDIT UNION - LAKE NONA

13810 NARCOOSSEE RD, ORLANDO, FL, 32801

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

CFE FEDERAL CREDIT UNION - LAKE NONA

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
CFE FEDERAL CREDIT UNION - LAKE NONA
Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10NU99 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
S & L Materials Inc · KISSIMMEE
One-way
15.2 mi
Round trip
30.4 mi
TypeNameCityOne-wayRT mi
quarryS & L Materials IncKISSIMMEE15.2 mi30.4
quarryBeeline MineOrlando18.0 mi36
quarryFLINT PLANTDavenport23.8 mi47.6
sand pitDavenport Sand MineBrooksville24.2 mi48.5
sand pitSILICA PLANTDavenport24.5 mi49
sand pitCypress SandLexington26.1 mi52.3
quarryRock Solid Rock, LLCTitusville26.8 mi53.5
sand pitFour Corners Sand MineBrooksville27.5 mi55
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
CFE FEDERAL CREDIT UNION - LAKE NONA

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10NU992026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/cfe-federal-credit-union-lake-nona-orange-fl-b0840215