Approved · unknownPasco County
URBAN SOLAR LLC project — 33-26-17
33-26-17
Load estimate pending
Lifecycle
Permitted as of Aug 8, 2025
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
URBAN SOLAR LLC project — 33-26-17
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
URBAN SOLAR
Developer / Applicant
CEPKAUSKAS MARTIN
Why this is a hauling opportunity: NOC — unclassified description: 33-26-17 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025152136 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
16.0 mi
Round trip
32 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 16.0 mi | 32 |
| sand pit | County Line Mine | Spring Hill | 17.6 mi | 35.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 19.2 mi | 38.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 19.7 mi | 39.4 |
| quarry | Brooksville Quarry | Brooksville | 29.6 mi | 59.3 |
| quarry | Brooksville South Cement Plant | Brooksville | 30.2 mi | 60.5 |
| quarry | Calcium Plant | Jacksonville | 33.4 mi | 66.7 |
| quarry | Caloosa Materials | Ruskin | 34.5 mi | 69 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
CEPKAUSKAS MARTIN
1 active project · Pasco
Contractor
URBAN SOLAR
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025152136 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/cepkauskas-martin-project-33-26-17-pasco-fl-356baf34