UNITED STATES FIRE INSURANCE COMPANY project — 11-26-19
11-26-19
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Center Connect Development III is a site development project in earthwork phase with permits issued, representing an immediate hauling opportunity (score: 75/100). The project will require significant excavation and material movement given its earthwork focus and current permit-ready status. Key contacts are CENTER CONNECT DEVELOPMENT III LLC as the general contractor and United States Fire Insurance as the owner/developer—reach out now while permitting is finalized and scheduling is underway.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025122136 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 5.5 mi | 11 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 12.4 mi | 24.8 |
| sand pit | County Line Mine | Spring Hill | 17.9 mi | 35.8 |
| quarry | Tampa Cement Grinding Plant | Tampa | 21.1 mi | 42.2 |
| quarry | West Florida Aggregate | Webster | 23.9 mi | 47.8 |
| quarry | Brooksville Quarry | Brooksville | 24.3 mi | 48.6 |
| quarry | Brooksville South Cement Plant | Brooksville | 24.4 mi | 48.8 |
| quarry | Calcium Plant | Jacksonville | 27.7 mi | 55.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025122136 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/center-connect-development-iii-llc-project-11-26-19-pasco-fl-e3869812