Leads/ccfafce8
Approved · planning

WINSTON ROY

5024 SOUTH THE RIVIERA STREET, TAMPA, FL, 33609

Load estimate pending
Lifecycle
Permitted as of Dec 3, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

WINSTON ROY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/3/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
HECKER CONSTRUCTION COMPANY, INC.
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0454294-001-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
5.3 mi
Round trip
10.5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa5.3 mi10.5
quarryCaloosa MaterialsRuskin17.1 mi34.2
quarryCentral State Aggregates LLCZephyrhill23.2 mi46.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 31.0 mi62.1
sand pitCounty Line MineSpring Hill34.2 mi68.5
quarryFour CornersLithia36.1 mi72.3
quarryWingate Creek MineLithia39.2 mi78.3
quarrySouth Pasture MineLithia40.8 mi81.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
HECKER CONSTRUCTION COMPANY, INC.

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0454294-001-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/ccfafce8