Approved · unknown
Ready Mix Concrete Plant — FLORIDA MINING BLVD. SITE
9715 Florida Mining Blvd E, JACKSONVILLE, FL, 32257
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Ready Mix Concrete Plant — FLORIDA MINING BLVD. SITE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Ready Mix Concrete Plant INACTIVE (shutdown unknown).
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0310223 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
WATER RECOVERY, LLC · Jacksonville
One-way
10.2 mi
Round trip
20.5 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
14.0 mi
Round trip
28 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dames Point Terminal | Brooksville | 14.0 mi | 28 |
| quarry | The Chemours Company FC LLC | Starke | 34.6 mi | 69.3 |
| sand pit | Goldhead Sand Plant | Jacksonville | 34.6 mi | 69.2 |
| quarry | SRM Materials East Palatka | Murfresboro | 34.8 mi | 69.5 |
| sand pit | Grandin Sand Plant | Jacksonville | 38.2 mi | 76.4 |
| sand pit | Keuka Sand Plant | Jacksonville | 44.5 mi | 89 |
| quarry | Edgar Minerals, Inc. | Davenport | 46.6 mi | 93.2 |
| transfer station | WATER RECOVERY, LLC | Jacksonville | 10.2 mi | 20.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0310223 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/cc18e323