Approved · unknownMARION County
Cleanup (petroleum cleanup) — OLD TIME GARAGE
12029 S WILLIAMS ST, DUNNELLON, FL, 34432
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — OLD TIME GARAGE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 3380-0563-00
Est truck loads
—
Needs site plan parse
Sources seen
12
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87797392 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_3380-0563-00_cb6290e0 from marionpa
- 2026-06-13FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87950720 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_3380-0563-00_5972fc32 from marionpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87981370 from fdep_cleanup_sites
- 2026-06-19MARIONPACaptured MARIONPA_3380-0563-00_6464f81f from marionpa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88052818 from fdep_cleanup_sites
- 2026-06-24FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88063019 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_3380-0563-00_824586bc from marionpa
- 2026-06-24MARIONPACaptured MARIONPA_3380-0563-00_69de8950 from marionpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88103815 from fdep_cleanup_sites
- 2026-06-28MARIONPACaptured MARIONPA_3380-0563-00_c4576d9f from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Manko Co Sec 5 Mine/Phos · Ocala
One-way
8.0 mi
Round trip
16 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 8.0 mi | 16 |
| quarry | 328 Pit | Ocala | 11.2 mi | 22.4 |
| quarry | Red Level Mine | Crystal River | 11.9 mi | 23.7 |
| quarry | Maylen Mine | Crystal River | 12.5 mi | 25 |
| quarry | Inglis Quarry | Brooksville | 12.6 mi | 25.2 |
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 12.8 mi | 25.6 |
| quarry | Lecanto Mine | Crystal River | 16.0 mi | 32 |
| quarry | NORTH MINE | OCALA | 22.9 mi | 45.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87797392 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_3380-0563-00_cb6290e0 | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87950720 | 2026-06-13 | Open ↗ |
| marionpa | MARIONPA_3380-0563-00_5972fc32 | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87981370 | 2026-06-16 | Open ↗ |
| marionpa | MARIONPA_3380-0563-00_6464f81f | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88052818 | 2026-06-23 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88063019 | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_3380-0563-00_824586bc | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_3380-0563-00_69de8950 | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88103815 | 2026-06-28 | Open ↗ |
| marionpa | MARIONPA_3380-0563-00_c4576d9f | 2026-06-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 3380-0563-00
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/cb6290e0