Leads/cb25d6d2
Approved · planningHillsborough County

Boyette Subdivision

Boyette Road, Brandon, FL

Load estimate pending
Lifecycle
Permitted as of May 14, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Boyette Subdivision

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 5/14/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
David Weekley Homes
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_925225 from swfwmd_erp
  2. 2026-05-21SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_925225_cb25d6d2 from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Drainage features (5)
  • on-site ponds (wet detention/flood plain mitigation
  • outlined in yellow)
  • temporary sediment basins (outlined in blue)
  • discharge sump
  • sampling point
Plan notes: This sheet is an Aerial Site Plan / Utility and Infrastructure Water Management Plan; no earthwork quantity tables or utility length schedules are present on this sheet. Dewatering will discharge to on-site ponds; off-site discharge only during initial storm water pond excavation.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Four Corners · Lithia
One-way
14.8 mi
Round trip
29.6 mi
TypeNameCityOne-wayRT mi
quarryFour CornersLithia14.8 mi29.6
quarryTampa Cement Grinding PlantTampa16.4 mi32.8
quarryCaloosa MaterialsRuskin17.2 mi34.4
quarrySouth Pasture MineLithia20.2 mi40.3
quarryWingate Creek MineLithia23.6 mi47.2
quarryCentral State Aggregates LLCZephyrhill26.2 mi52.5
quarrySouth Fort Meade MineLithia30.1 mi60.1
sand pitHaines City MineDavenport41.6 mi83.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
David Weekley Homes
Engineer of Record
LevelUp Consulting, LLC

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9252252026-05-17Open ↗
swfwmd_erp_plansSWFWMD_PLANS_925225_cb25d6d22026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
City
Brandon
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/cb25d6d2