CAS CONSTRUCTION LLC project — 29-26-18
29-26-18
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
CAS Construction LLC is executing a site development earthwork project at 29-26-18 with permits now issued, representing an immediate hauling opportunity. The project requires excavation, grading, and material movement typical of site prep work, making it ideal for hauling providers specializing in bulk soil, rock, and debris removal. Contact CAS Construction LLC (407-707-4213) directly as the prime GC, or reach out to owner Jimenez Yuderka to position for equipment and disposal services while the project mobilizes.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026055291 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 13.5 mi | 27.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 14.1 mi | 28.2 |
| sand pit | County Line Mine | Spring Hill | 16.7 mi | 33.5 |
| quarry | Tampa Cement Grinding Plant | Tampa | 18.5 mi | 37 |
| quarry | Brooksville Quarry | Brooksville | 27.4 mi | 54.8 |
| quarry | Brooksville South Cement Plant | Brooksville | 27.9 mi | 55.7 |
| quarry | Calcium Plant | Jacksonville | 31.1 mi | 62.3 |
| quarry | West Florida Aggregate | Webster | 32.3 mi | 64.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026055291 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/cas-construction-llc-project-29-26-18-pasco-fl-cf8374b4