Leads/ca4bc4bf
Approved · unknownPinellas County

FDOT — I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60 - BRIDGE-REPLACE AND ADD LANES

Pinellas County — FDOT Contract E7R10

Load estimate pending
Lifecycle
Active as of Apr 1, 2020
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60 - BRIDGE-REPLACE AND ADD LANES

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$48.1M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60 - BRIDGE-REPLACE AND. Vendor: ARCHER WESTERN/TRAYLOR BROS. JO. Cost: $48,096,103. | FDOT public project (+15) | size signal: $48,096,103 valuation (+20) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $48,096,103 valuation (+20) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $48,096,103 valuation (+20) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55) | FDOT public project (+15) | size signal: $48,096,103 valuation (+20) | stage=under_construction, but stale (6y old) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E7R10_4 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
7.1 mi
Round trip
14.2 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa7.1 mi14.2
quarryCaloosa MaterialsRuskin17.8 mi35.5
quarryCentral State Aggregates LLCZephyrhill24.4 mi48.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 31.2 mi62.5
sand pitCounty Line MineSpring Hill34.2 mi68.3
quarryFour CornersLithia37.9 mi75.8
quarryWingate Creek MineLithia40.3 mi80.7
quarrySouth Pasture MineLithia42.5 mi84.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E7R10_42026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/ca4bc4bf