Leads/c9da76f6
Approved · unknownBroward County

Beach nourishment — Pompano Beach to Fort Lauderdale (130,000 cy)

Pompano Beach to Fort Lauderdale, Broward County, FL

Load estimate pending
Lifecycle
Completed as of Jan 1, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Beach nourishment — Pompano Beach to Fort Lauderdale (130,000 cy)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$1.6M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Beach nourishment Broward County Shore Protection Project — 130,000 cy placed. Source: Upland. Type: Nourishment. Counties with prior nourishment cycle every 6-10 years. | size signal: $1,560,000 valuation (+12) | size signal: $1,560,000 valuation (+12) | size signal: $1,560,000 valuation (+12) | size signal: $1,560,000 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SAND_PLACEMENT
    Captured FDEP_SANDPLACE_275 from fdep_sand_placement

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
WHITE ROCK QUARRIES · West Palm Beach
One-way
29.5 mi
Round trip
59 mi
TypeNameCityOne-wayRT mi
quarryWHITE ROCK QUARRIESWest Palm Beach29.5 mi59
quarryFEC QUARRYMIAMI31.4 mi62.8
quarryPENNSUCO CEMENT PLANTMedley31.7 mi63.5
quarryPENNSUCO QUARRYMedley31.7 mi63.5
quarryPalm Beach Aggregates LLCJacksonville36.1 mi72.1
quarryEpic Stoneworks, Inc.Cutler Bay36.9 mi73.8
quarryMiami QuarryJacksonville37.0 mi73.9
quarryMiami Cement PlantMiami38.8 mi77.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Broward County Permits
Fort Lauderdale area Building Division
ConnectorRecord IDCapturedLink
fdep_sand_placementFDEP_SANDPLACE_2752026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Broward
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/c9da76f6