Leads/c97280c0
Approved · planning

PEACE RIVER WSA

1255 MABRY CARLTON PARKWAY, VENICE, FL, 34292

Load estimate pending
Lifecycle
Permitted as of Jan 23, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

PEACE RIVER WSA

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/23/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0294167-003-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
13.9 mi
Round trip
27.8 mi
TypeNameCityOne-wayRT mi
quarryFlorida Shell & Fill Company LLCNaples13.9 mi27.8
sand pitWashington Loop MinePunta Gorda26.9 mi53.8
quarryWingate Creek MineLithia27.7 mi55.4
quarryBermont Materials AlicoPunta Gorda28.5 mi57
quarry4M-31 MineAlva29.6 mi59.2
sand pitWatermelon PitPunta Gorda36.8 mi73.5
quarryHalls MineNaples37.1 mi74.2
sand pitWillliams Farms Sand & Shell, Inc.PUNTA GORDA37.7 mi75.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0294167-003-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/c97280c0