Approved · unknownSarasota County
FDOT — I-75 AT TOLEDO BLADE INTERCHANGE IMPROVEMENTS - INTERCHANGE IMPROVEMENT
Sarasota County — FDOT Contract E1X04
Load estimate pending
Lifecycle
Active as of Apr 1, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — I-75 AT TOLEDO BLADE INTERCHANGE IMPROVEMENTS - INTERCHANGE IMPROVEMENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$6.9M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT earthwork contract — I-75 AT TOLEDO BLADE INTERCHANGE IMPROVEMENTS - INTERCHANGE IMPROVEMENT. Vendor: AJAX PAVING INDUSTRIES OF FLORIDA LLC. Cost: $6,866,181. | FDOT public project (+15) | size signal: $6,866,181 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $6,866,181 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $6,866,181 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E1X04_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Washington Loop Mine · Punta Gorda
One-way
15.7 mi
Round trip
31.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Washington Loop Mine | Punta Gorda | 15.7 mi | 31.4 |
| quarry | Florida Shell & Fill Company LLC | Naples | 16.2 mi | 32.5 |
| quarry | Bermont Materials Alico | Punta Gorda | 17.5 mi | 35 |
| quarry | 4M-31 Mine | Alva | 19.5 mi | 38.9 |
| sand pit | Watermelon Pit | Punta Gorda | 25.1 mi | 50.3 |
| quarry | Halls Mine | Naples | 25.6 mi | 51.2 |
| sand pit | Willliams Farms Sand & Shell, Inc. | PUNTA GORDA | 26.1 mi | 52.2 |
| quarry | Wright Farms Pit | Nocatee | 26.2 mi | 52.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E1X04_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/c87f2638