Leads/c715d7fe
Approved · planningManatee County

1805 DOCK REPLACEMENT - WILLIS

1805 4TH ST W, PALMETTO, FL, 34221

Load estimate pending
Lifecycle
Permitted as of Aug 26, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

1805 DOCK REPLACEMENT - WILLIS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 8/26/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$811K
Actual — from source record
Acreage
Parcel 3099200002
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
OWNER
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $811,149 valuation (+5) | stage=permit_issued, recent (+10) | homeowner-scale dock/seawall — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0461696-001-EG from fdep_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_3099200002_c715d7fe from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
6.4 mi
Round trip
12.8 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.8 mi
Round trip
31.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin15.8 mi31.6
quarryWingate Creek MineLithia28.4 mi56.8
quarryTampa Cement Grinding PlantTampa30.4 mi60.8
quarrySouth Pasture MineLithia40.2 mi80.3
quarryFour CornersLithia41.4 mi82.9
quarryFlorida Shell & Fill Company LLCNaples42.0 mi84.1
quarry4M-31 MineAlva49.3 mi98.5
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton6.4 mi12.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
OWNER
3 active projects · Hillsborough
~26 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0461696-001-EG2026-05-24Open ↗
fl_dor_cadastralFDOR_3099200002_c715d7fe2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
3099200002
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/c715d7fe