Leads/c605437b
Approved · planning

7Brew Springhill (Mariner Blvd)

160 Mariner Blvd, Spring Hill, FL, 34609

~84loads
fill dirt
≤1 wk
Lifecycle
Permitted as of Mar 26, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

7Brew Springhill (Mariner Blvd)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/26/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.76 ac
Parcel R31-223-18-3522-00A0-0000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
7Crew Florida, LLC
Why this is a hauling opportunity: Base unknown/other (20) | size signal: ~84 est. loads (+6) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24SWFWMD_ERP
    Captured SWFWMD_ERP_930203 from swfwmd_erp
  2. 2026-05-24SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_930203_c605437b from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Max grading change2 ft
Utility trenches (each LF ≈ 1 cy spoil)
water main
1 LF
sanitary sewer
75 LF
Drainage features (3)
  • Proposed storm pipe (on-site drainage conveyance); no detention/retention ponds
  • swales
  • or outfalls explicitly labeled
Plan notes: No earthwork cut/fill summary table is present in these plans; pavement sections reference a site-specific geotechnical report prepared by an unspecified firm (noted as 'XX, dated XX') but no soil classifications are provided. All cut/fill slopes specified at 3:1 or flatter.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
1.4 mi
Round trip
2.7 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill1.4 mi2.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 4.8 mi9.7
quarryBrooksville QuarryBrooksville12.1 mi24.2
quarryBrooksville South Cement PlantBrooksville12.9 mi25.7
quarryCalcium PlantJacksonville15.7 mi31.4
quarryCenter Hill MineBrooksville19.4 mi38.8
quarryCentral State Aggregates LLCZephyrhill22.1 mi44.2
quarryWest Florida AggregateWebster25.6 mi51.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
7Crew Florida, LLC
Engineer of Record
Bowman Consulting Group Ltd
12355 Sunrise Valley Drive Suite 520 Reston, VA 20191

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9302032026-05-24Open ↗
swfwmd_erp_plansSWFWMD_PLANS_930203_c605437b2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
R31-223-18-3522-00A0-0000
City
Spring Hill
Acreage
0.76 ac
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/c605437b