Leads/c587d9ce
Approved · unknownHILLSBOROUGH County

Cleanup (petroleum cleanup) — TAMPA ELECTRIC CO-BIG BEND STATION

13031 WYANDOTTE RD, APOLLO BEACH, FL, 33572

~1.7kloads
fill dirt + base rock
~3 mo
Lifecycle
Active as of Jun 8, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — TAMPA ELECTRIC CO-BIG BEND STATION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
6.962 ac
Parcel 0514700000
Est truck loads
Needs site plan parse
Sources seen
8
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
TAMPA ELECTRIC CO
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0159810-003-BE from fdep_spgp
  2. 2026-05-29HCPA
    Captured HCPA_0514700000_1a093bb5 from hcpa
  3. 2026-06-09FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87913950 from fdep_cleanup_sites
  4. 2026-06-11HCPA
    Captured HCPA_0514700000_c587d9ce from hcpa
  5. 2026-06-12FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87954822 from fdep_cleanup_sites
  6. 2026-06-21HCPA
    Captured HCPA_0514700000_1b9c6a47 from hcpa
  7. 2026-06-24FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88067115 from fdep_cleanup_sites
  8. 2026-06-24HCPA
    Captured HCPA_0514700000_da0e139f from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
7.0 mi
Round trip
13.9 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin7.0 mi13.9
quarryTampa Cement Grinding PlantTampa9.7 mi19.4
quarryFour CornersLithia26.7 mi53.4
quarryWingate Creek MineLithia27.0 mi54
quarryCentral State Aggregates LLCZephyrhill28.8 mi57.5
quarrySouth Pasture MineLithia30.0 mi59.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 40.9 mi81.7
quarrySouth Fort Meade MineLithia41.1 mi82.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
TAMPA ELECTRIC CO

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0159810-003-BE2026-05-28Open ↗
hcpaHCPA_0514700000_1a093bb52026-05-29Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879139502026-06-09Open ↗
hcpaHCPA_0514700000_c587d9ce2026-06-11Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879548222026-06-12Open ↗
hcpaHCPA_0514700000_1b9c6a472026-06-21Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_880671152026-06-24Open ↗
hcpaHCPA_0514700000_da0e139f2026-06-24Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0514700000
Strap
U-09-31-19-ZZZ-000001-73660.0
Address
13031 WYANDOTTE RD, GIBSONTON
Zip
33534
Acreage
6.962 ac
Sq ft
303,246
Homestead
NO
Owner of record
TAMPA ELECTRIC CO
Last sale
1974-01-01
$771,300

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/c587d9ce