Approved · unknown
Limestone Quarry — AENON CHURCH ROAD SAND PIT
AENON CHURCH RD, TALLAHASSEE, FL, 32304
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Limestone Quarry — AENON CHURCH ROAD SAND PIT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Operating limestone quarry — supplier/customer location for haulers. | unknown type, no size signal — capped <40
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_7776097 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
LEON COUNTY SOLID WASTE TRANSFER STATION · Tallahassee
One-way
2.0 mi
Round trip
4.1 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
5.8 mi
Round trip
11.7 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Silver Lake 1 | Tallahassee | 5.8 mi | 11.7 |
| quarry | Active Minerals Attapulgite Division | Quincy | 18.0 mi | 36 |
| quarry | Quincy Plant and Mines | QUINCY | 18.1 mi | 36.2 |
| sand pit | A-Mining Group II LLC. | Quincy | 19.5 mi | 38.9 |
| quarry | CYD Cabbage Grove | Daytona Beach | 29.7 mi | 59.4 |
| quarry | Perry Quarry | Fort Myers | 30.0 mi | 59.9 |
| transfer station | LEON COUNTY SOLID WASTE TRANSFER STATION | Tallahassee | 2.0 mi | 4.1 |
| landfill | WELDONS LANDFILL | Tallahassee | 3.2 mi | 6.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_7776097 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/c30e046f