BRIDGEWAY CHURCH project — 04-26-20
04-26-20
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The Bridgeway Church project in development includes site development with a focus on earthwork and is currently under construction. This presents significant hauling opportunities for providers, as the project demands substantial material movement and site preparation. Key contacts for hauling coordination are Spectrum Contracting Services Inc. as the general contractor and Bridgeway Church as the owner and developer.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-19PASCO_NOCCaptured Pasco_2026089621 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2026045601 from pasco_noc
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_04-26-20-0120-0B100-0000_af2408e1 from fl_dor_cadastral
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_04-26-20-0120-0B100-0000_b8aa1231 from fl_dor_cadastral
- 2026-06-08PASCOPACaptured PASCOPA_04-26-20-0120-0B100-0000_af2408e1 from pascopa
- 2026-06-08PASCOPACaptured PASCOPA_04-26-20-0120-0B100-0000_b8aa1231 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 3.4 mi | 6.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 14.3 mi | 28.6 |
| sand pit | County Line Mine | Spring Hill | 20.1 mi | 40.2 |
| quarry | West Florida Aggregate | Webster | 20.7 mi | 41.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 23.1 mi | 46.3 |
| quarry | Brooksville South Cement Plant | Brooksville | 24.2 mi | 48.5 |
| quarry | Brooksville Quarry | Brooksville | 24.3 mi | 48.6 |
| quarry | Calcium Plant | Jacksonville | 27.5 mi | 54.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026089621 | 2026-05-19 | Open ↗ |
| pasco_noc | Pasco_2026045601 | 2026-05-21 | Open ↗ |
| fl_dor_cadastral | FDOR_04-26-20-0120-0B100-0000_af2408e1 | 2026-05-28 | Open ↗ |
| fl_dor_cadastral | FDOR_04-26-20-0120-0B100-0000_b8aa1231 | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_04-26-20-0120-0B100-0000_af2408e1 | 2026-06-08 | Open ↗ |
| pascopa | PASCOPA_04-26-20-0120-0B100-0000_b8aa1231 | 2026-06-08 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 04-26-20-0120-0B100-0000
- Strap
- 04-26-20-0120-0B100-0000
- Address
- Acreage
- 7.73 ac
- Sq ft
- 336,719
- Use
- Vacant
- Just (market)
- $0
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/bridgeway-church-project-04-26-20-pasco-fl-f8f2ca7c