Leads/bluestreamfiber-project-06-25-21-pasco-fl-8ef2920c
Approved · unknownPasco County

QUALITY FIRST ELECTRIC project — 06-25-21

06-25-21

~2.6kloads
fill dirt + base rock
~4 mo
Lifecycle
Permitted as of Aug 6, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

QUALITY FIRST ELECTRIC project — 06-25-21

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
19.03 ac
Parcel 06-25-21-0020-00000-0S10
Est truck loads
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor
QUALITY FIRST ELECTRIC
Developer / Applicant
BLUESTREAMFIBER
Why this is a hauling opportunity: NOC — unclassified description: 06-25-21 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 19 ac disturbed, ~2643 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 19 ac disturbed, ~2643 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 19 ac disturbed, ~2643 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 19 ac disturbed, ~2643 est. loads (+25) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025149958 from pasco_noc
  2. 2026-05-21PASCO_NOC
    Captured Pasco_2025225677 from pasco_noc
  3. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_06-25-21-0020-00000-0S10_06d5b09c from fl_dor_cadastral
  4. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_06-25-21-0020-00000-0S10_223139d6 from fl_dor_cadastral
  5. 2026-06-08PASCOPA
    Captured PASCOPA_06-25-21-0020-00000-0S10_06d5b09c from pascopa
  6. 2026-06-08PASCOPA
    Captured PASCOPA_06-25-21-0020-00000-0S10_223139d6 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
9.8 mi
Round trip
19.5 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill9.8 mi19.5
quarryWest Florida AggregateWebster13.4 mi26.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.2 mi30.4
quarryBrooksville South Cement PlantBrooksville20.4 mi40.7
sand pitCounty Line MineSpring Hill20.8 mi41.5
quarryBrooksville QuarryBrooksville20.7 mi41.4
quarryCenter Hill MineBrooksville22.1 mi44.3
quarryCalcium PlantJacksonville23.3 mi46.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
BLUESTREAMFIBER
1 active project · Pasco
~2,643 est. loads · fill dirt
Contractor
QUALITY FIRST ELECTRIC
1 active project · Pasco
~2,643 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20251499582026-05-21Open ↗
pasco_nocPasco_20252256772026-05-21Open ↗
fl_dor_cadastralFDOR_06-25-21-0020-00000-0S10_06d5b09c2026-05-28Open ↗
fl_dor_cadastralFDOR_06-25-21-0020-00000-0S10_223139d62026-05-28Open ↗
pascopaPASCOPA_06-25-21-0020-00000-0S10_06d5b09c2026-06-08Open ↗
pascopaPASCOPA_06-25-21-0020-00000-0S10_223139d62026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
06-25-21-0020-00000-0S10
Strap
06-25-21-0020-00000-0S10
Address
Acreage
19.03 ac
Sq ft
828,947
Owner of record
LAKE JOVITA HOMEOWNERS
Last sale

No sale on record

Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/bluestreamfiber-project-06-25-21-pasco-fl-8ef2920c