BLOCK 75
325 N FLORIDA AVE, TAMPA, FL, 33602
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
BLOCK 75 is a site development project in Tampa focused on stormwater work at 325 N Florida Ave, 33602. Although the NPDES permit is terminated/closed, there may be final haul-off needs for soil, debris, and other stormwater-related materials during closeout, presenting opportunities for earthwork and cleanup hauling. The listed contact is BLOCK 75 (applicant); GC/owner/contractor details are not provided—coordinate with BLOCK 75 to identify the appropriate hauling contacts and target closeout material needs.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-02-15NPDES_STORMWATERCaptured FLR20CP30 from npdes_stormwater
- 2026-05-16HCPACaptured HCPA_1935670000 from hcpa
- 2026-05-16HCPACaptured HCPA_1935670000_d0228ac4 from hcpa
- 2026-05-20TAMPA_ACCELACaptured CRT-26-0000246 from tampa_accela
- 2026-05-21HCPACaptured HCPA_1935670000_35b2fdd1 from hcpa
- 2026-05-22HCPACaptured HCPA_1935670000_67644b9a from hcpa
- 2026-05-25HCPACaptured HCPA_1935670000_fef29beb from hcpa
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87801061 from fdep_cleanup_sites
- 2026-06-09FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87913511 from fdep_cleanup_sites
- 2026-06-10HCPACaptured HCPA_1935670000_1c063693 from hcpa
- 2026-06-10HCPACaptured HCPA_1935670000_d8c771a8 from hcpa
- 2026-06-12FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87954384 from fdep_cleanup_sites
- 2026-06-21HCPACaptured HCPA_1935670000_ea9a96dd from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 1.2 mi | 2.4 |
| quarry | Caloosa Materials | Ruskin | 16.9 mi | 33.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 20.3 mi | 40.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 30.4 mi | 60.7 |
| quarry | Four Corners | Lithia | 32.3 mi | 64.6 |
| sand pit | County Line Mine | Spring Hill | 34.2 mi | 68.4 |
| quarry | Wingate Creek Mine | Lithia | 37.1 mi | 74.2 |
| quarry | South Pasture Mine | Lithia | 37.5 mi | 74.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| npdes_stormwater | FLR20CP30 | 2026-02-15 | Open ↗ |
| hcpa | HCPA_1935670000 | 2026-05-16 | Open ↗ |
| hcpa | HCPA_1935670000_d0228ac4 | 2026-05-16 | Open ↗ |
| tampa_accela | CRT-26-0000246 | 2026-05-20 | Open ↗ |
| hcpa | HCPA_1935670000_35b2fdd1 | 2026-05-21 | Open ↗ |
| hcpa | HCPA_1935670000_67644b9a | 2026-05-22 | Open ↗ |
| hcpa | HCPA_1935670000_fef29beb | 2026-05-25 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87801061 | 2026-05-28 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87913511 | 2026-06-09 | Open ↗ |
| hcpa | HCPA_1935670000_1c063693 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_1935670000_d8c771a8 | 2026-06-10 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87954384 | 2026-06-12 | Open ↗ |
| hcpa | HCPA_1935670000_ea9a96dd | 2026-06-21 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 1935670000
- Strap
- A-24-29-18-4ZI-000075-00002.0
- Address
- 325 N FLORIDA AVE, TAMPA
- Zip
- 33602
- Acreage
- 0.124 ac
- Sq ft
- 5,381
- Homestead
- NO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/block-75-d0228ac4