Leads/bennett-marti-j-project-31-26-19-pasco-fl-2c6d0dca
Approved · unknownPasco County

BENNETT MARTI J project — 31-26-19

31-26-19

~472loads
fill dirt + base rock
3 wk
Lifecycle
Active as of May 15, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

BENNETT MARTI J project — 31-26-19

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$3K
Actual — from source record
Acreage
3.4 ac
Parcel 31-26-19-0070-49900-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
NEWSOUTH WINDOW SOLUTION
📞 (813) 626-6000
Developer / Applicant
PASCO COUNTY
Why this is a hauling opportunity: NOC — unclassified description: 31-26-19 | Connector base: 50 | Stage = under_construction — actionable now (+10) | size signal: 3.4 ac disturbed, ~472 est. loads (+12) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | size signal: 3.4 ac disturbed, ~472 est. loads (+12) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | size signal: 3.4 ac disturbed, ~472 est. loads (+12) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | size signal: 3.4 ac disturbed, ~472 est. loads (+12) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-16PASCO_NOC
    Captured Pasco_2026090692 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_31-26-19-0070-49900-0000_2687618b from fl_dor_cadastral
  3. 2026-06-01PASCOPA
    Captured PASCOPA_31-26-19-0070-49900-0000_2687618b from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
9.2 mi
Round trip
18.5 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill9.2 mi18.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 14.6 mi29.3
quarryTampa Cement Grinding PlantTampa16.7 mi33.5
sand pitCounty Line MineSpring Hill19.1 mi38.3
quarryBrooksville QuarryBrooksville28.0 mi56
quarryBrooksville South Cement PlantBrooksville28.2 mi56.5
quarryWest Florida AggregateWebster29.5 mi59
quarryCalcium PlantJacksonville31.6 mi63.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PASCO COUNTY
1 active project · Pasco
Pasco County, FL, USA
Contractor
NEWSOUTH WINDOW SOLUTION
1 active project · Pasco
~472 est. loads · fill dirt
📞 (813) 626-6000

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260906922026-05-16Open ↗
fl_dor_cadastralFDOR_31-26-19-0070-49900-0000_2687618b2026-05-28Open ↗
pascopaPASCOPA_31-26-19-0070-49900-0000_2687618b2026-06-01Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
31-26-19-0070-49900-0000
Strap
31-26-19-0070-49900-0000
Address
Acreage
3.4 ac
Sq ft
148,104
Owner of record
PASCO COUNTY
Last sale

No sale on record

Appraiser valuation
Just (market)
$3,400

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/bennett-marti-j-project-31-26-19-pasco-fl-2c6d0dca