BEACON A & H
7836 N CARL G ROSE HWY, HERNANDO, FL, 34442
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 4/1/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24FDEP_ERPCaptured FDEP_ERP_0470423-001-EG from fdep_erp
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 3.4 mi | 6.9 |
| quarry | Maylen Mine | Crystal River | 11.3 mi | 22.6 |
| quarry | Lecanto Mine | Crystal River | 13.5 mi | 26.9 |
| quarry | 328 Pit | Ocala | 14.4 mi | 28.8 |
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 14.9 mi | 29.9 |
| quarry | Red Level Mine | Crystal River | 16.5 mi | 33 |
| quarry | Inglis Quarry | Brooksville | 18.7 mi | 37.4 |
| quarry | NORTH MINE | OCALA | 19.2 mi | 38.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_erp | FDEP_ERP_0470423-001-EG | 2026-05-24 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/becfce2a